Expected move calculator

Your numbers

The current share price.

Annualized, in percent, for example 30. The at-the-money IV of the expiry you are measuring fits best.

Calendar days to the expiry date, or trading days if you choose the 252-day basis below.

Day count

The call plus the put at the strike nearest the price, same expiry, per share.

Results

Expected move (1 SD)
$8.60
As a share of the price
8.6%
1-SD range (about 68% in a normal model)
$91.40 – $108.60
2-SD range (about 95% in a normal model)
$82.80 – $117.20
1-SD move from the straddle (÷ 0.8)
$8.63

An educational tool: the ranges assume normally distributed returns at a constant implied volatility; real returns have fatter tails, and IV changes. Nothing you enter is sent or saved. Not investment advice.

Expected move table: the 1-SD move as a share of the price (calendar days)

Implied volatility7 days30 days45 days90 days1 year
20%2.8%5.7%7.0%9.9%20.0%
30%4.2%8.6%10.5%14.9%30.0%
40%5.5%11.5%14.0%19.9%40.0%
60%8.3%17.2%21.1%29.8%60.0%
80%11.1%22.9%28.1%39.7%80.0%
100%13.8%28.7%35.1%49.7%100.0%

How to use it

The formula

Worked example

Questions

How do you calculate the expected move from implied volatility?

Multiply the stock price by the implied volatility as a decimal and by the square root of the days to expiry divided by 365. A $100 stock with an IV of 30% and 30 days to expiry has an expected move of about 100 × 0.30 × √(30 ÷ 365) ≈ $8.60.

Calendar days or trading days?

Either, as long as the count and the divisor match: calendar days ÷ 365 or trading days ÷ 252. They give nearly the same result. Trading days leave out weekends, when prices barely move, which some traders prefer for short expiries that span a weekend.

Why divide the straddle by 0.8 rather than multiply it by 0.85?

In the normal model an at-the-money straddle is worth about 0.8 of the 1-SD move, so straddle ÷ 0.8 converts it to one standard deviation. Multiplying the straddle by 0.85, a rule of thumb sometimes quoted, gives about 0.68 of a standard deviation. Many brokers show the straddle price itself as the expected move, so check which definition a source uses.

What share of outcomes stays inside the expected move?

About 68% inside 1 SD and 95% inside 2 SD if returns were normally distributed. Real returns have fat tails: moves beyond 2 SD happen more often than the 4.6% the model implies, especially around earnings and macro events.

Does the expected move predict the direction?

No. It is symmetric: options price the size of a move, not its direction. A larger expected move means more movement is priced in, up or down.

Which implied volatility should I use?

The at-the-money implied volatility of the expiry you are measuring. An index such as the VIX, or another expiry’s IV, can differ widely, especially when an earnings date falls between them. IV also changes over time, so the expected move is a snapshot.

Other calculators

From the calculation to the record

Save the entry, stop and target as a plan before the trade, then log the fills. The journal works out R, expectancy and drawdown from your own trades, and its AI score grades how closely each trade followed the plan. A free account is all it takes.